PLAN BEFORE YOU BUILD
A practical starting point for your detached garage or garage pad: permit order, site plans, foundation questions and drainage considerations before work begins.

Get the paperwork and the ground working together.
A garage plan needs more than a building footprint. Setbacks, access, foundation design and drainage can affect both the application and the site work. Use the quick-reference PDF alongside the County’s current requirements.
Your garage planning reference.
Download Prairie Acre’s quick-reference PDF, then check the current County resources below for your application.
Download the planning guide
01 / Confirm the approvals
Check which development, building, approach and grading approvals apply to your property. Where a development permit is required, its approval must be in place before the building permit can be approved.
02 / Prepare a clear site plan
Show the proposed garage, existing structures, property lines, setbacks and access. Include relevant natural features and constraints so the layout can be reviewed in context.
03 / Resolve the foundation
Engineering depends on foundation type, slab size, building design and project conditions. The County checklist identifies multiple foundation systems that require it. Confirm your full proposal with the County and engage the appropriate regulated professional; a smaller slab alone does not establish an exemption.
04 / Plan grades & access
Coordinate pad elevations, the driveway connection and surface drainage. A lot grading plan or approach approval may be required depending on the scope and approval conditions.
MEASURED. CONSIDERED. PREPARED.
Avoid delays before the excavator arrives.
01
Complete the layout
Confirm the building position and setbacks before pricing the pad.
02
Check the details
Resolve foundation engineering, drainage and the drawings needed for your application.
03
Build to the plan
Proceed with the required approvals and agreed site elevations. Check deadlines and conditions on your permits.
Before you get started.
Practical answers for your next step.
Keep planning your project.
YOUR NEXT STEP
Plan the garage. Prepare the site.
Bring your proposed layout, available drawings and County correspondence. We can help define the site planning and ground work. Engineering and regulated survey work must be completed by the appropriate professional.